feat: add perf v2 support #739
Triggered via pull request
September 23, 2025 14:20
Status
Failure
Total duration
4m 58s
Artifacts
–
Annotations
19 errors and 1 notice
|
compat-integration-test-instrumentation (--features async_futures -p codspeed-criterion-compat)
Process completed with exit code 101.
|
|
tests
Process completed with exit code 101.
|
|
compat-integration-test-instrumentation (-p codspeed-divan-compat)
The operation was canceled.
|
|
compat-integration-test-instrumentation (-p codspeed-divan-compat)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
|
|
msrv-check
Process completed with exit code 1.
|
|
compat-integration-test-instrumentation (-p codspeed-bencher-compat)
The operation was canceled.
|
|
compat-integration-test-instrumentation (-p codspeed-bencher-compat)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
|
|
compat-integration-test-instrumentation (-p codspeed)
The operation was canceled.
|
|
compat-integration-test-instrumentation (-p codspeed)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
|
|
compat-integration-test-instrumentation (-p codspeed-divan-compat-examples)
The operation was canceled.
|
|
compat-integration-test-instrumentation (-p codspeed-divan-compat-examples)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
|
|
lint
Process completed with exit code 1.
|
|
compat-integration-test-walltime (codspeed-criterion-compat)
Process completed with exit code 101.
|
|
compat-integration-test-walltime (codspeed-divan-compat-examples)
The operation was canceled.
|
|
compat-integration-test-walltime (codspeed-divan-compat-examples)
The strategy configuration was canceled because "compat-integration-test-walltime.codspeed-criterion-compat" failed
|
|
compat-integration-test-walltime (codspeed-divan-compat)
The operation was canceled.
|
|
compat-integration-test-walltime (codspeed-divan-compat)
The strategy configuration was canceled because "compat-integration-test-walltime.codspeed-criterion-compat" failed
|
|
lint-windows
Process completed with exit code 1.
|
|
check
Process completed with exit code 1.
|
|
lint-windows
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677
|