Skip to content

feat: add perf v2 support #738

feat: add perf v2 support

feat: add perf v2 support #738

Triggered via pull request September 23, 2025 14:13
Status Failure
Total duration 4m 14s
Artifacts

ci.yml

on: pull_request
Matrix: compat-integration-test-instrumentation
Matrix: compat-integration-test-walltime
Fit to window
Zoom out
Zoom in

Annotations

19 errors and 1 notice
msrv-check
Process completed with exit code 1.
tests
Process completed with exit code 101.
compat-integration-test-instrumentation (-p codspeed-divan-compat)
The operation was canceled.
compat-integration-test-instrumentation (-p codspeed-divan-compat)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
lint
Process completed with exit code 1.
compat-integration-test-instrumentation (-p codspeed-bencher-compat)
The operation was canceled.
compat-integration-test-instrumentation (-p codspeed-bencher-compat)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
compat-integration-test-instrumentation (-p codspeed-divan-compat-examples)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
compat-integration-test-instrumentation (-p codspeed)
The operation was canceled.
compat-integration-test-instrumentation (-p codspeed)
The strategy configuration was canceled because "compat-integration-test-instrumentation._--features_async_futures" failed
compat-integration-test-walltime (codspeed-criterion-compat)
Process completed with exit code 101.
compat-integration-test-walltime (codspeed-divan-compat-examples)
The operation was canceled.
compat-integration-test-walltime (codspeed-divan-compat-examples)
The strategy configuration was canceled because "compat-integration-test-walltime.codspeed-criterion-compat" failed
compat-integration-test-walltime (codspeed-divan-compat)
The operation was canceled.
compat-integration-test-walltime (codspeed-divan-compat)
The strategy configuration was canceled because "compat-integration-test-walltime.codspeed-criterion-compat" failed
lint-windows
Process completed with exit code 1.
check
Process completed with exit code 1.
lint-windows
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677